YA

Operating asset

Yarrabee Coal

YAL.ASX Production Australia open_pit 100% owned
Valuation case2026-10-19
2026E saleable coal2.13 MtPCI coal · literal product tonnes
ROM / CHPP feed2.87 Mt0× strip ratio
CHPP / saleable yield74.3%Saleable tonnes ÷ ROM feed
Realised coal price$186.79/tModeled pricing point
Site cash cost$64.38/tPer saleable tonne
Cash margin$95.53/tAfter royalties and modeled deductions
Risked NPV$1,444m100% ownership

Investment verdict

Long-reserve-life ultra-low-vol PCI mine with established Gladstone access but weak current yield disclosure

B+
  • B+
    Grade & continuity

    Yarrabee's PCI product is differentiated by ultra-low volatile matter; the current reserve carries 10.5% ash and 10% moisture, with historical phosphorus around 0.096%.

  • B
    Metallurgy

    The 1H26 saleable-to-ROM yield was 73.3%; detailed washability curves are not disclosed.

  • B
    Mining complexity

    Open-cut truck-and-shovel mining is conventional, but current strip ratio and mine-level cost are unavailable.

  • B+
    Infrastructure & power

    The Blackwater rail system provides an established path to Gladstone export infrastructure, subject to rail and terminal commitments.

  • B+
    Permitting status

    The mine is operating under established Queensland tenure; closure cash timing is available only at group level.

  • B+
    Resource confidence

    70Mt recoverable and 52Mt marketable reserve support roughly twenty-five modeled years at current portfolio-scaled output.

  • B+
    Geological upside

    275Mt of gross resource provides additional conversion inventory.

  • B+
    Expansion optionality

    Long reserve life and PCI exposure provide optionality, but mine-level cost, strip and product mix are needed to underwrite it fully.

Valuation snapshot

100% NAV retained
Unrisked NPV $1,444m

Project DCF before the published stage and execution-risk charge.

Risk charge −$0m

Value removed by the model's project-stage and execution-risk adjustment.

Risked NPV $1,444m

Selected project value after risk, before ownership attribution.

Effective discount rate 7%

Time-value hurdle used for the project DCF after published adjustments.

NPV at first production $1,444m

Production-value anchor with pre-production timing removed; used by the FSV ladder.

Annual operating profile

Spot · risked · 100% of project
Saleable coal and CHPP yieldannual ROM-to-product conversion
Mt · %
Saleable-tonne economics2026E operating row and life-of-mine cost basis
US$/t
Realised price$186.79/t
Site cash cost$64.38/t
Cash cost incl. sustaining$103.58/t
Cash margin$95.53/t
ROM coal70 Mt
Saleable coal52 Mt
LOM saleable yield74.3%
Site cost / ROM t$47.83/t

A 100% yield indicates a schedule already expressed in saleable tonnes.

Revenue and cost stackcosts and capital aligned below zero
US$m
Capital recoveryannual and cumulative project cash flow
US$m

Timeline Built from the stored anchor years: construction start, first production, and closure (or first production plus reserve life where no closure year is published). The marker is the year the current valuation is struck from.

Construction
1982–2026
Production
2026–2051
19821991200020092018202720362045

Dashed line marks 2026, the year this valuation is struck from.

Resources and reserves

Effective 31 Dec 2025 · 100% basis

Ore reserves

AssetProven & probable (Mt)
Yarrabee Coal Mine 70.0

Mineral resources

AssetMeasured (Mt)Indicated (Mt)Measured & indicated (Mt)Inferred (Mt)Total (Mt)
Yarrabee Coal Mine 55.0 140 195 80.0 275

Coal tonnes are on the disclosed source basis; no equivalent conversion is applied.

Valuation framework Fair speculative value ladder Production →
Two valuation lenses $1,444m production-value OV anchors the speculative ladder; $1,444m stage-risked DCF is the selected modeled project value.

Speculative value by development stage

Current model stage Production 100%–100% certainty
Market-implied project value $5,396m Company market capitalization
USD OV NPV$1,444mAt production value
Diluted1,320.2mCompany shares F.D.
Net interest100%Attributable ownership
Exchange rate1.0000USD framework
Project stage Certainty FSV range Attributable FSV USD / share
01 Grassroots
0.5%–1%
$7m – $14m
$7m – $14m
$0.01 – $0.01
02 Target Drilling
1%–2.5%
$14m – $36m
$14m – $36m
$0.01 – $0.03
03 Discovery Delineation
2.5%–5%
$36m – $72m
$36m – $72m
$0.03 – $0.05
04 Infill & Metallurgy
5%–10%
$72m – $144m
$72m – $144m
$0.05 – $0.11
05 PEA
10%–25%
$144m – $361m
$144m – $361m
$0.11 – $0.27
06 Prefeasibility
25%–50%
$361m – $722m
$361m – $722m
$0.27 – $0.55
07 Permitting & Feasibility
50%–75%
$722m – $1,083m
$722m – $1,083m
$0.55 – $0.82
08 Construction
75%–100%
$1,083m – $1,444m
$1,083m – $1,444m
$0.82 – $1.09
09 Production Current
100%
$1,444m
$1,444m
$1.09
Formula OV NPV × stage certainty × net interest ÷ diluted shares. Red marker = company market capitalization.