Cash margin—/tAfter royalties and modeled deductions
Risked NPV$606m100% ownership
Investment verdict
Large-scale metallurgical coal development project offering significant operational and infrastructure synergies with adjacent Daunia
A
A
Grade & continuity
High-quality Rangal and Fort Cooper coal measures yielding premium metallurgical and thermal products.
A
Metallurgy
High washability yield for metallurgical coal products.
A
Mining complexity
Low strip ratio open-cut deposit suitable for dragline and truck/shovel mining.
A
Infrastructure & power
Adjacent to Daunia mine with direct access to existing rail corridors and port terminal allocations.
B+
Permitting status
Environmental Impact Statement (EIS) and approval process progressing.
A
Resource confidence
Over 1.1 billion tonnes of JORC compliant coal resources.
A
Geological upside
Substantial regional resource upside and seam extensions.
A
Expansion optionality
Synergy realization with Daunia fleet and infrastructure.
Valuation snapshot
66.5% NAV retained
Unrisked NPV$911m
Project DCF before the published stage and execution-risk charge.
Risk charge−$305m
Value removed by the model's project-stage and execution-risk adjustment.
Risked NPV$606m
Selected project value after risk, before ownership attribution.
Effective discount rate9%
Time-value hurdle used for the project DCF after published adjustments.
NPV at first production$1,875m
Production-value anchor with pre-production timing removed; used by the FSV ladder.
Annual operating profile
Spot · risked · 100% of project
Saleable coal and CHPP yieldannual ROM-to-product conversion
Mt · %
Saleable-tonne economics2026E operating row and life-of-mine cost basis
US$/t
Realised price$0/t
Site cash cost$132.01/t
Cash cost incl. sustaining$172.49/t
Cash margin—/t
ROM coal404 Mt
Saleable coal240 Mt
LOM saleable yield59.4%
Site cost / ROM t$78.42/t
A 100% yield indicates a schedule already expressed in saleable tonnes.
Revenue and cost stackcosts and capital aligned below zero
US$m
Capital recoveryannual and cumulative project cash flow
US$m
Timeline Built from the stored anchor years: construction start, first production, and closure (or first production plus reserve life where no closure year is published). The marker is the year the current valuation is struck from.
Construction
2028–2030
Production
2030–2031
202620272028202920302031
Dashed line marks 2026, the year this valuation is struck from.
Resources and reserves
100% basis
Ore reserves
Asset
Proven (Mt)
Probable (Mt)
Proven & probable (Mt)
Winchester South Project
338
66.0
404
Mineral resources
Asset
Measured (Mt)
Indicated (Mt)
Measured & indicated (Mt)
Inferred (Mt)
Total (Mt)
Winchester South Project
490
370
860
240
1,100
Coal tonnes are on the disclosed source basis; no equivalent conversion is applied.
Valuation framework Fair speculative value ladderPrefeasibility →
Two valuation lenses$1,875m production-value OV anchors the speculative
ladder; $606m stage-risked DCF is the selected modeled project value.
Speculative value by development stage
Current model stagePrefeasibility 25%–50%
certainty
Market-implied project value$4,280m Company market capitalization