CHPP / saleable yield73%Saleable tonnes ÷ ROM feed
Realised coal price$197.58/tModeled pricing point
Site cash cost$107.43/tPer saleable tonne
Cash margin$60.04/tAfter royalties and modeled deductions
Risked NPV$1,572m100% ownership
Investment verdict
High-efficiency metallurgical coal open cut with full autonomous haulage and adjacent synergies with Winchester South
A
A
Grade & continuity
High-quality hard coking and PCI coal seams in the Northern Bowen Basin with consistent grade continuity.
A
Metallurgy
Modern CHPP with excellent yield producing premium export metallurgical coal.
A
Mining complexity
Fully autonomous haulage system (AHS) truck fleet with high mechanical availability.
A
Infrastructure & power
Established heavy-haul rail to Hay Point and Dalrymple Bay Coal Terminals (DBCT).
A
Permitting status
All state and federal operating permits in place.
A
Resource confidence
Well-drilled JORC compliant resource and reserve base.
B+
Geological upside
Synergies with adjacent Winchester South development deposit.
B+
Expansion optionality
Transition to Southern Domain pit expanding long-term operational life.
Valuation snapshot
100% NAV retained
Unrisked NPV$1,572m
Project DCF before the published stage and execution-risk charge.
Risk charge−$0m
Value removed by the model's project-stage and execution-risk adjustment.
Risked NPV$1,572m
Selected project value after risk, before ownership attribution.
Effective discount rate7%
Time-value hurdle used for the project DCF after published adjustments.
NPV at first production$1,426m
Production-value anchor with pre-production timing removed; used by the FSV ladder.
Annual operating profile
Spot · risked · 100% of project
Saleable coal and CHPP yieldannual ROM-to-product conversion
Mt · %
Saleable-tonne economics2026E operating row and life-of-mine cost basis
US$/t
Realised price$197.58/t
Site cash cost$107.43/t
Cash cost incl. sustaining$147.24/t
Cash margin$60.04/t
ROM coal111.6 Mt
Saleable coal81.5 Mt
LOM saleable yield73%
Site cost / ROM t$78.42/t
A 100% yield indicates a schedule already expressed in saleable tonnes.
Revenue and cost stackcosts and capital aligned below zero
US$m
Capital recoveryannual and cumulative project cash flow
US$m
Timeline Built from the stored anchor years: construction start, first production, and closure (or first production plus reserve life where no closure year is published). The marker is the year the current valuation is struck from.
Construction
2024–2026
Production
2026–2043
2024202720302033203620392042
Dashed line marks 2026, the year this valuation is struck from.
Resources and reserves
Effective 30 Jun 2026 · 100% basis
Ore reserves
Asset
Proven (Mt)
Probable (Mt)
Proven & probable (Mt)
Daunia Mine
65.0
45.0
110
Mineral resources
Asset
Measured (Mt)
Indicated (Mt)
Measured & indicated (Mt)
Inferred (Mt)
Total (Mt)
Daunia Mine
95.0
70.0
165
35.0
200
Coal tonnes are on the disclosed source basis; no equivalent conversion is applied.
Valuation framework Fair speculative value ladderProduction →
Two valuation lenses$1,426m production-value OV anchors the speculative
ladder; $1,572m stage-risked DCF is the selected modeled project value.
Speculative value by development stage
Current model stageProduction 100%–100%
certainty
Market-implied project value$4,280m Company market capitalization