SO

Operating asset

South Walker Creek

SMR.ASX Production Australia open_pit 100% owned
Valuation case2026-10-16
2026E saleable coal6.8 Mtmetallurgical coal · literal product tonnes
ROM / CHPP feed8.81 Mt8.7× strip ratio
CHPP / saleable yield77.2%Saleable tonnes ÷ ROM feed
Realised coal price$184.88/tModeled pricing point
Site cash cost$115.67/tPer saleable tonne
Cash margin$42.91/tAfter royalties and modeled deductions
Risked NPV$1,715m100% ownership

Investment verdict

Large, long-lived low-volatility PCI operation with established export access and a meaningful strip burden

B+
  • B+
    Grade & continuity

    Stanmore describes a high-quality, predominantly low-volatility PCI product. Numeric ash, sulfur, phosphorus and CSR/CSN specifications are not disclosed in the current model pack.

  • B+
    Metallurgy

    The operating CHPP produced a 70.9% 1H26 saleable-to-ROM yield. Product-by-product washability and quality recovery curves are not disclosed.

  • B
    Mining complexity

    Conventional open-cut dragline and truck-and-shovel mining is proven, but the 8.7 bcm/t 1H26 strip ratio is a material cost and execution variable.

  • A
    Infrastructure & power

    Established mine, CHPP and Bowen Basin rail path to Dalrymple Bay Coal Terminal provide a proven route to export markets.

  • B+
    Permitting status

    The mine is in steady-state production. Mine-level permit life, bonding and closure cash timing are not separately disclosed in the model pack.

  • A
    Resource confidence

    The 122Mt marketable reserve supports roughly 18 years at modeled production, backed by a much larger measured and indicated resource inventory.

  • A
    Geological upside

    The 593Mt measured and indicated resource plus 225Mt inferred inventory provides substantial reserve-conversion potential beyond the base schedule.

  • B+
    Expansion optionality

    Management identifies a mine life beyond 25 years and has invested in stripping; conversion of resources and sustained cost delivery determine the economic extension.

Valuation snapshot

100% NAV retained
Unrisked NPV $1,715m

Project DCF before the published stage and execution-risk charge.

Risk charge −$0m

Value removed by the model's project-stage and execution-risk adjustment.

Risked NPV $1,715m

Selected project value after risk, before ownership attribution.

Effective discount rate 7%

Time-value hurdle used for the project DCF after published adjustments.

NPV at first production $1,715m

Production-value anchor with pre-production timing removed; used by the FSV ladder.

Annual operating profile

Spot · risked · 100% of project
Saleable coal and CHPP yieldannual ROM-to-product conversion
Mt · %
Saleable-tonne economics2026E operating row and life-of-mine cost basis
US$/t
Realised price$184.88/t
Site cash cost$115.67/t
Cash cost incl. sustaining$148.87/t
Cash margin$42.91/t
ROM coal158 Mt
Saleable coal122 Mt
LOM saleable yield77.2%
Site cost / ROM t$89.32/t

A 100% yield indicates a schedule already expressed in saleable tonnes.

Revenue and cost stackcosts and capital aligned below zero
US$m
Capital recoveryannual and cumulative project cash flow
US$m

Timeline Built from the stored anchor years: construction start, first production, and closure (or first production plus reserve life where no closure year is published). The marker is the year the current valuation is struck from.

Construction
1996–2026
Production
2026–2044
199620022008201420202026203220382044

Dashed line marks 2026, the year this valuation is struck from.

Resources and reserves

Effective 31 Dec 2025 · Attributable basis

Ore reserves

AssetProven & probable (Mt)
South Walker Creek Mine 158

Mineral resources

AssetMeasured (Mt)Indicated (Mt)Measured & indicated (Mt)Inferred (Mt)Total (Mt)
South Walker Creek Mine 274 319 593 225 818

Coal tonnes are on the disclosed source basis; no equivalent conversion is applied.

Valuation framework Fair speculative value ladder Production →
Two valuation lenses $1,715m production-value OV anchors the speculative ladder; $1,715m stage-risked DCF is the selected modeled project value.

Speculative value by development stage

Current model stage Production 100%–100% certainty
Market-implied project value $1,690m Company market capitalization
USD OV NPV$1,715mAt production value
Diluted901.4mCompany shares F.D.
Net interest100%Attributable ownership
Exchange rate1.0000USD framework
Project stage Certainty FSV range Attributable FSV USD / share
01 Grassroots
0.5%–1%
$9m – $17m
$9m – $17m
$0.01 – $0.02
02 Target Drilling
1%–2.5%
$17m – $43m
$17m – $43m
$0.02 – $0.05
03 Discovery Delineation
2.5%–5%
$43m – $86m
$43m – $86m
$0.05 – $0.1
04 Infill & Metallurgy
5%–10%
$86m – $172m
$86m – $172m
$0.1 – $0.19
05 PEA
10%–25%
$172m – $429m
$172m – $429m
$0.19 – $0.48
06 Prefeasibility
25%–50%
$429m – $858m
$429m – $858m
$0.48 – $0.95
07 Permitting & Feasibility
50%–75%
$858m – $1,286m
$858m – $1,286m
$0.95 – $1.43
08 Construction
75%–100%
$1,286m – $1,715m
$1,286m – $1,715m
$1.43 – $1.9
09 Production Current
100%
$1,715m
$1,715m
$1.9
Formula OV NPV × stage certainty × net interest ÷ diluted shares. Red marker = company market capitalization.