WE

Operating asset

West Elk

CNR Production USA underground 100% owned
Valuation case2026-10-19
2026E saleable coal5.5 Mtwest elk thermal coal · literal product tonnes
ROM / CHPP feed5.5 Mt0× strip ratio
CHPP / saleable yield100%Saleable tonnes ÷ ROM feed
Realised coal price$51/tModeled pricing point
Site cash cost$39.75/tPer saleable tonne
Cash margin$11.25/tAfter royalties and modeled deductions
Risked NPV$106m100% ownership

Investment verdict

A productive high-CV longwall mine with limited standalone public technical disclosure

B+
  • B+
    Grade & continuity

    31.5M saleable reserve tons support a compact reserve life and a differentiated high-calorific-value export product.

  • B+
    Metallurgy

    The long-running mine uses conventional underground production and coal preparation without a novel process route.

  • B
    Mining complexity

    Longwall mining is proven but exposed to face moves, geology and underground operating interruptions, with less multi-mine redundancy than PAMC.

  • B+
    Infrastructure & power

    Established Colorado mine infrastructure and export access are adequate, though inland rail distance constrains delivered-market competitiveness.

  • B
    Permitting status

    The mine is operating and permitted, but its long-run permitting, ARO and reclamation schedule is not separately disclosed.

  • B+
    Resource confidence

    The 2025 10-K reports proven and probable reserves, but Core does not treat West Elk as a material property requiring a standalone S-K 1300 report.

  • C
    Geological upside

    No separate measured, indicated or inferred resource is disclosed, so the model credits no inventory beyond reserves.

  • C
    Expansion optionality

    Current management guidance supports 5-6M tons annually, but the 31.5M-ton reserve and absent expansion study limit visible mine-life extension.

Valuation snapshot

100% NAV retained
Unrisked NPV $106m

Project DCF before the published stage and execution-risk charge.

Risk charge −$0m

Value removed by the model's project-stage and execution-risk adjustment.

Risked NPV $106m

Selected project value after risk, before ownership attribution.

Effective discount rate 7%

Time-value hurdle used for the project DCF after published adjustments.

NPV at first production $106m

Production-value anchor with pre-production timing removed; used by the FSV ladder.

Annual operating profile

Spot · risked · 100% of project
Saleable coal and CHPP yieldannual ROM-to-product conversion
Mt · %
Saleable-tonne economics2026E operating row and life-of-mine cost basis
US$/t
Realised price$51/t
Site cash cost$39.75/t
Cash cost incl. sustaining$45.75/t
Cash margin$11.25/t
ROM coal31.5 Mt
Saleable coal31.5 Mt
LOM saleable yield100%
Site cost / ROM t$39.75/t

A 100% yield indicates a schedule already expressed in saleable tonnes.

Revenue and cost stackcosts and capital aligned below zero
US$m
Capital recoveryannual and cumulative project cash flow
US$m

Timeline Built from the stored anchor years: construction start, first production, and closure (or first production plus reserve life where no closure year is published). The marker is the year the current valuation is struck from.

Construction
1981–2026
Production
2026–2032
19811988199520022009201620232030

Dashed line marks 2026, the year this valuation is struck from.

Resources and reserves

Effective 31 Dec 2025 · Attributable basis

Ore reserves

AssetProven (Mt)Probable (Mt)Proven & probable (Mt)
West Elk Mine 29.8 1.70 31.5

Coal tonnes are on the disclosed source basis; no equivalent conversion is applied.

Valuation framework Fair speculative value ladder Production →
Two valuation lenses $106m production-value OV anchors the speculative ladder; $106m stage-risked DCF is the selected modeled project value.

Speculative value by development stage

Current model stage Production 100%–100% certainty
Market-implied project value $4,508m Company market capitalization
USD OV NPV$106mAt production value
Diluted49.9mCompany shares F.D.
Net interest100%Attributable ownership
Exchange rate1.0000USD framework
Project stage Certainty FSV range Attributable FSV USD / share
01 Grassroots
0.5%–1%
$1m – $1m
$1m – $1m
$0.01 – $0.02
02 Target Drilling
1%–2.5%
$1m – $3m
$1m – $3m
$0.02 – $0.05
03 Discovery Delineation
2.5%–5%
$3m – $5m
$3m – $5m
$0.05 – $0.11
04 Infill & Metallurgy
5%–10%
$5m – $11m
$5m – $11m
$0.11 – $0.21
05 PEA
10%–25%
$11m – $26m
$11m – $26m
$0.21 – $0.53
06 Prefeasibility
25%–50%
$26m – $53m
$26m – $53m
$0.53 – $1.06
07 Permitting & Feasibility
50%–75%
$53m – $79m
$53m – $79m
$1.06 – $1.59
08 Construction
75%–100%
$79m – $106m
$79m – $106m
$1.59 – $2.12
09 Production Current
100%
$106m
$106m
$2.12
Formula OV NPV × stage certainty × net interest ÷ diluted shares. Red marker = company market capitalization.