Leer and Leer South use proven preparation plants and conventional metallurgical-coal washing with established product specifications.
B
Mining complexity
Three-mine succession reduces depletion risk, but longwall transfers, Leer West development and the recent Leer South combustion event demonstrate underground complexity.
B+
Infrastructure & power
Established rail and East Coast terminal access support export markets; Leer West still requires staged mine-development capital before it becomes the successor operation.
B+
Permitting status
Active operations are permitted and bonded, while Leer West's long-dated plan requires future permit execution and land-control conversion.
A
Resource confidence
The amended February 2026 S-K 1300 report publishes reserve/resource tables plus complete 2026-2063 production, cost and capital schedules.
B+
Geological upside
Resources materially exceed current reserves and provide conversion potential, though only reserve-backed and explicitly identified future-control tons enter the economic schedule.
A
Expansion optionality
Leer West provides an engineered successor from the mid-2030s and sustains complex production through 2063 if development and market assumptions hold.
Valuation snapshot
100% NAV retained
Unrisked NPV$3,309m
Project DCF before the published stage and execution-risk charge.
Risk charge−$0m
Value removed by the model's project-stage and execution-risk adjustment.
Risked NPV$3,309m
Selected project value after risk, before ownership attribution.
Effective discount rate7%
Time-value hurdle used for the project DCF after published adjustments.
NPV at first production$1,987m
Production-value anchor with pre-production timing removed; used by the FSV ladder.
Annual operating profile
Spot · risked · 100% of project
Saleable coal and CHPP yieldannual ROM-to-product conversion
Mt · %
Saleable-tonne economics2026E operating row and life-of-mine cost basis
US$/t
Realised price$140.32/t
Site cash cost$72.35/t
Cash cost incl. sustaining$83.4/t
Cash margin$59.58/t
ROM coal176.5 Mt
Saleable coal176.5 Mt
LOM saleable yield100%
Site cost / ROM t$72.35/t
A 100% yield indicates a schedule already expressed in saleable tonnes.
Revenue and cost stackcosts and capital aligned below zero
US$m
Capital recoveryannual and cumulative project cash flow
US$m
Timeline Built from the stored anchor years: construction start, first production, and closure (or first production plus reserve life where no closure year is published). The marker is the year the current valuation is struck from.
Construction
2011–2026
Production
2026–2064
20112018202520322039204620532060
Dashed line marks 2026, the year this valuation is struck from.
Resources and reserves
Effective 31 Dec 2025 · Attributable basis
Ore reserves
Asset
Proven (Mt)
Probable (Mt)
Proven & probable (Mt)
Leer Complex
141
29.3
170
Mineral resources
Asset
Measured (Mt)
Indicated (Mt)
Measured & indicated (Mt)
Leer Complex
254
54.2
308
Coal tonnes are on the disclosed source basis; no equivalent conversion is applied.
Valuation framework Fair speculative value ladderProduction →
Two valuation lenses$1,987m production-value OV anchors the speculative
ladder; $3,309m stage-risked DCF is the selected modeled project value.
Speculative value by development stage
Current model stageProduction 100%–100%
certainty
Market-implied project value$4,508m Company market capitalization